Gas 600 MW expansion project at Pioneer Generation Station begins 8.4.2023 Share Construction recently began at Pioneer Generation Station Phase IV, a 600 MW expansion of Basin Electric Power Cooperative’s existing natural gas-fueled generation facility northwest of Williston, North Dakota. The project will be Basin Electric’s largest single-site generation project since the 1980s. It will include two Siemens STG6-5000F simple-cycle combustion turbines and six Wärtsilä W18V50SG reciprocating engines. Basin Electric said preliminary estimates place the budget at approximately $780 million, which includes both generation and transmission assets. The co-op said load forecasts have showed the need for more electricity by 2025 to serve the Bakken region’s rapidly growing demand. Burns & McDonnell is the EPC for the project. Related Articles SaskPower brings new combined-cycle plant online SWEPCO expands generation capacity with new gas, renewable resources NERC warns of ‘urgent need’ for new energy resources over the next decade EIA: US natural gas consumption for generation continues to grow